Built on a live highway project

Every tonne, every kilometre, on one screen.

The plant operator logs the shift on a tablet. Paving progress, stock and cost follow by themselves — chainage by chainage, layer by layer. And it keeps working when the site has no signal.

Read-only demo with sample data — no sign-up.

RUNNING
Asphalt Plant A
1,353.7
TON
EME 0/20 · 16+200 · LEFT LANE
36TRUCKS
190.8T / HOUR
7:52ELAPSED
Capacity 97%
STOCK RUNWAY
4.2 days · Bitumen 50/70
PAVED TODAY
610 m 12+400 → 13+010
01 / the problem

Production is in one file. Quantities in another. Cost arrives at month end.

Every road project runs the same three spreadsheets, and none of them agree with each other.

The plant knows tonnes

Shift totals live on paper or in the operator's head until someone types them up.

The site knows metres

Which chainage got which layer is tracked separately, by hand, and rarely matches the plant.

The office knows money

Cost per tonne shows up weeks later, when nothing can be done about it any more.

02 / at the plant

One tablet. Two buttons. Nothing typed twice.

The operator adds a truck and, if the plant stops, taps the reason. That is the entire job. Rate against nominal capacity, stop losses and shift totals are computed as they go — and the same shift stays correct on a phone and a tablet at once.

AK-109 35.3 t/ 1,353.715:43
AK-112 39.3 t/ 1,318.415:36
AK-103 38.6 t/ 1,279.115:10
RK-112 35.9 t/ 1,044.813:59
×K-102 34.2 t/ 1,009.013:48
AK-110 38.8 t/ 974.713:36
Paving progress 61%
Binder · EME 0/200+000 → 15+000
Wearing · BBME 0/140+000 → 15+000
Viaduct decks7+400 → 7+800
Binder Wearing Structures
03 / on the road

Progress measured in chainage, not in guesses.

Import the surveyor's coordinates once. From then on every shift is placed between two kilometre marks, on a lane, in a layer — with viaduct decks counted on their own. What is left, and the material it needs, follows from the same numbers.

04 / in the office

Stock comes off the recipe. Cost lands the same day.

Every tonne produced draws its bitumen, aggregate and filler straight from the mix design, so the run-out warning arrives days early instead of on delivery day. Cost is carried in as many currencies as the project actually uses.

Bitumen 50/7074,443USD
Aggregate38,910USD
Fuel & energy21,265USD
Labour & plant29,780USD
Cost per tonne41.18USD/t
05 / the difference

An asphalt plant is rarely where the signal is.

ASPHORA installs to the home screen and runs offline. Trucks entered with no connection are queued on the device and reconciled the moment it returns — the operator never waits for a spinner, and no shift is lost to a dead bar of signal.

247
QUEUED · SYNCS ON RECONNECT
Nothing lost, nothing typed twice
06 / anywhere

Written for any road project, not for one country.

Time zone, locale, currency, materials and mix designs all come from the project itself. Nothing about a site is baked into the software.

4interface languages
15+currencies, side by side
recipes and materials
1tablet per plant

Look at a real shift before you decide.

The demo is a full project with sample data — production, chainage, stock. Read-only, nothing to install.

demo@asphora.app · Asphora-Demo-2026